Fire Safety Audit

Every facility has some level of fire threat and risk. The presence of flammable or combustible material, as well as the likelihood of spark or ignition, creates a fire hazard. According to fire statistics, fire and explosion in factories/industries account for about 8-10% of fatalities. Visualmitra is conducting a one-day Checklist Audit on Fire Safety as a preventive action against damage, and this attempt is a memorial to the firemen who died in the tragic fire at Bombay Dock in 1944.

Considering electrical hazards are one of the leading causes of fire, Visualmitra has developed this new Electrical Checklist Audit idea. This one-day Checklist Audit on fire and electrical safety will present a gap analysis strategy for fire and electrical safety systems, as well as methods to improve the safety standard through important solutions. These Checklist Audits are only available for installation at a discounted rate during Fire Service Week, which is celebrated across India.

The Major Areas That Will Be Examined During The Fire Checklist Audit
  • Fire Safety Management System.
  • The Preventive Measures.
  • The Protective Measures.
  • The first Aid Fire Fighting System.
  • The Fixed Fire Fighting System.
  • Fire Safety for First Responder.
  • Fire Safety Legislation.
  • Fire Emergency Plan.
Duration

The duration of Fire Safety Audit is for 1 Day or Maximum of 8 Hours.

The Major Areas That Will Be Examined During An Electrical Checklist Audit

  • Electrical Safety Management System
  • Electrical hazards and control Measures
  • Personal safe guarding w.r.t. electrical work
  • PPE norms and practices
  • Maintenance procedures
  • Electrical Safety Legislation (CEA Regulations / NBC/ applicable Indian Standards).
Audit Scope

  • The Minimum number of participants should be 25 nos.
  • Face to face training.

Call us, & our Visual Management Expert will Visit your Facility

Our Happy Clients